Group Practice Areas SANTIN | ENERGY

Client: Biocon

  • Project: Biocon / Angola
Job details

Implementation of a biomass thermal power plant 120MW

  • Assembly and installation of 02 boilers VS-500 – 200tvh, 67,0kgf/cm², temp: 485º each.
  • Assembly and interconnection of steam pipelines between boiler and the power room:
    • Alloy steel pipes of 67kgf/cm²;
    • Steam reduction pipes;
    • Generator and condensers water cooling pipes
  • Installing and assembly of the sugarcane bagasse system.
  • Assembly of the sugarcane reception:
    • Feeder table;
    • Conveyor belt;
    • Diffusor;
    • Mill suit.
  • Assembly and interconnection of the fermentation system:
    • Fermentation vats;
    • Pre-fermentation;
    • Pre-fermentation structures;
    • Heat exchangers;
    • Cooling towers.
  • Assembly and interconnection of the system of alcohol production:
    • Distillation columns ;
    • Condenser;
    • Heat exchangers;
    • Alcohol measuring tanks;
    • Cooling towers.
  • Assembly and interconnection of the alcohol storage system:
    • 10.000 m³ tanks.
  • Assembly and interconnection of the Pipe-Racks:
    • Steam pipes;
    • Juice pipes;
    • Water pipes;
    • Chemical products pipes;
    • Honey pipes;
    • Condensed pipes;
  • Manufacturing and assembly of structures:
    • Pipe-Racks;
    • Power house floor;
    • Pre-Fermentation floor;
    • Fermentation floor;
    • Juice treatment floor;
    • Juice heating floor;

Client: ENERGISA

  • Projet: Vista Alegre I e II / MS
Job Details

Implementation of a biomass thermal power plant 60MW

  • Earthwork;
  • Equipment base;
  • Drainage;
  • Paving;
  • CCM;
  • Power house;
  • Cooling tower;
  • System of energy cogeneration;
  • Backpressure turbine generators – 30 MW;
  • Condensation turbine generators – 30 MW;
  • Power house Pipe-Racks e structures;
  • interconnection of the high pressure steam system – 67 kgf/cm² between boiler and the power house;
  • Interconnection of the cooling towers system;
  • Steam reducing system with conditioner valves;
  • Interconnection of the system of condensed water;
  • Manufacturing and assembly of the condensed water tanks;
  • Supply and assembly of the power house floor;
  • Supply and assembly of the demineralized water tank – 4.000 m³.

Client: BROOKFIELD

  • Project: Santa Cândida I e II / SP
Job details

Implementation of a biomass thermal power plant 60MW

  • Earthwork;
  • Equipment base;
  • Drainage;
  • Paving;
  • CCM;
  • Power house
  • Cooling tower;
  • System of energy cogeneration;
  • Backpressure turbine generators – 30 MW;
  • Condensation turbine generators – 30 MW;
  • Power house Pipe-Racks e structures;
  • Interconnection of the high pressure steam system – 67 kgf/cm² between boiler and the power house;
  • Interconnection of the cooling towers system;
  • Steam reducing system with conditioner valves;
  • Interconnection of the system of condensed water;
  • Manufacturing and assembly of the condensation water tanks;
  • Supply and assembly of the power house floor;
  • Supply and Water Tank Assembly Demineralized – 4.000 m³.