Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Eldorado
Job details
  • Installing and assembly of the energy cogeneration system;
  • Backpressure turbo generator – 55 MW;
  • Condensing turbo generator – 55 MW;
  • Pipe-Racks supply and power house structures;
  • Interconnection of the high pressure steam system 100 kgf/cm² between boiler and power house;
  • Interconnection of the cooling towers system;
  • Interconnection of the steam reducing system;
  • Supply and assembly of the power house floor
  • Manufacturing, installation and assembly and distill and Fermentation System, being 8 vats of 2.000 m³ each;
  • 8 Dornas de 2.000 m³ each;
  • Installing and assembly yeast centrifuge system
  • Installing and assembly of the pre fermenter, 3 unities 200 m³ each;
  • Interconnection of the cooling towers system
  • Installing and assembly of the alcohol distilling equipment system – cap. of 1.500 m³ each;
  • Fire drill system in all industrial and alcohol storage area
  • Installing and assembly of the sludge evaporation and decantation system:
  • Assembly and installation of the juice evaporation system with integrated system of Multivias for the steam and great diameter pipes – up to até 70”;
  • Manufacturing, assembly and installation of juice decanter – 01 unities cap. 600 m³;
  • Assembly and installation of the particle separator filters system;
  • Assembly and installation of the vacuum filtration system;
  • Alcohol storage system:
  • 02 tanks cap. 20.000 m³ each;
  • Interconnection of fire and alcohol systems.