Client: BROOKFIELD

  • Project: Santa Cândida I and II / SP
Job details

Implementation of a biomass thermal power plant 60MW

  • Earthwork;
  • Equipment base;
  • Drainage;
  • Paving;
  • CCM;
  • Power house
  • Cooling tower;
  • System of energy cogeneration;
  • Backpressure turbine generators – 30 MW;
  • Condensation turbine generators – 30 MW;
  • Power house Pipe-Racks e structures;
  • Interconnection of the high pressure steam system – 67 kgf/cm² between boiler and the power house;
  • Interconnection of the cooling towers system;
  • Steam reducing system with conditioner valves;
  • Interconnection of the system of condensed water;
  • Manufacturing and assembly of the condensation water tanks;
  • Supply and assembly of the power house floor;
  • Supply and Water Tank Assembly Demineralized – 4.000 m³.