Group practice areas SANTIN | SUGARCANE

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Água Emendada / GO
Job details

Implementation of a biomass thermal power plant 120MW

  • Installation of the Fermentation System, being 8 vats of 2.000 m³ each;
  • Assembly and installation of the yeast centrifuge system;
  • Assembly and installation of the pre-fermenters, being 200 m³ each;
  • Assembly and installation of the juice evaporation system with integrated system of Multivias for the steam and great diameter pipes – up to até 60”;
  • Assembly and installation of juice decanters – 02 unities cap. 600 m³ each;
  • Assembly and installation of the particle separator filters system;
  • Assembly and installation of the vacuum filtration system;
  • Interconnection of the cooling towers system; Interconnection of the high pressure vapor system – 67,0 kgf/cm², connecting with the 02 energy turbines 30 MW;
  • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Manufacturing and assembly of the ethanol tanks cap 10.000 m³ e 20.000 m³ with integrated fire system;
  • Assembly and installation of the stainless steel diffusor with cap.15.000 ton/day;
  • Assembly and installation Cane feeding system (feeder table and conveyor belt)
  • Assembly and installation Alcohol distilling equipment – cap. De 1.000 m³ each;

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Santa Luzia
Job details
  • Alcohol storage system:
    • 02 Tanks with cap. 20.000 m³ each;
    • Interconnection of the alcohol and fire system.
  • Interconnection of the cooling towers system;
  • Interconnection of the high pressure vapor system – 67,0 kgf/cm², connecting with the 02 energy turbines 30 MW;
  • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Installing and assembly of the sugarcane bagasse system;
  • Installing and assembly the sugarcane dry cleaning system;
  • Manufacturing and assembly of 01 fermentation vat 2.000 m³ interconnected with the existent system;
  • Fire systems in all the industrial area.

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Eldorado
Job details
  • Installing and assembly of the energy cogeneration system;
    • Backpressure turbo generator – 55 MW;
    • Condensing turbo generator – 55 MW;
    • Pipe-Racks supply and power house structures;
    • Interconnection of the high pressure steam system 100 kgf/cm² between boiler and power house;
    • Interconnection of the cooling towers system;
    • Interconnection of the steam reducing system;
    • Supply and assembly of the power house floor
  • Manufacturing, installation and assembly and distill and Fermentation System, being 8 vats of 2.000 m³ each;
    • 8 Dornas de 2.000 m³ each;
    • Installing and assembly yeast centrifuge system
    • Installing and assembly of the pre fermenter, 3 unities 200 m³ each;
    • Interconnection of the cooling towers system
    • Installing and assembly of the alcohol distilling equipment system – cap. of 1.500 m³ each;
    • Fire drill system in all industrial and alcohol storage area
  • Installing and assembly of the sludge evaporation and decantation system:
    • Assembly and installation of the juice evaporation system with integrated system of Multivias for the steam and great diameter pipes – up to até 70”;
    • Manufacturing, assembly and installation of juice decanter – 01 unities cap. 600 m³;
    • Assembly and installation of the particle separator filters system;
    • Assembly and installation of the vacuum filtration system;
  • Alcohol storage system:
    • 02 tanks cap. 20.000 m³ each;
    • Interconnection of fire and alcohol systems.

Client: EQUIPAV/RENUKA DO BRASIL

Job details
  • Manufacturing, Assembly and installation of the pre-fermentation and fermentation system:
    • 08 vats de 2.000 m³ each;
    • 03 pre-fermenters 300 m³ each;
    • Interconnection of the Fermentation System;
    • Interconnection of the pre-fermentation System;
    • Interconnection of the water system – cooling towers;
    • Interconnection. of the yeast centrifuge system
  • Supply, manufacturing, assembly and installation of evaporation and decantation system:
    • 01 Pre-Evaporator of 3.000 m³;
    • 01 Decanter of 800 m³.
  • Supply, manufacturing, assembly and installation of Alcohol storage system:
    • 04 Tanks of 20.000 m³;
    • Interconnection of fire and alcohol systems
  • Power house:
    • Installation of steam turbine – 42,5 MVA;
    • Interconnection of the high pressure vapor system – 67,0 kgf/cm² between boiler and power house;
    • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Assembly and installation of the sugar manufacturing and drying systems:
  • 04 cooker 600 Hectoliters;
  • 01 cooker 300 Hectoliters;
  • 04 crystallizers 600 Hectoliters;
  • 04 Sugar Centrifuges;
  • 02 Centrifuges KONTI 14;
  • 01 continuous cooker 2.000 Hectoliters.
  • Supply, assembly and installation of bagasse system:
    • Dosing mills;
    • Transporters structures;
    • Transporters of chains 01, 02, 03,04 e 05;
    • Transporters of taliscas 01.

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Alto Taquari
Job details
  • Installation and assembly of the Fermentation System, being 8 vats of 2.000 m³ each;
  • Assembly and installation of the yeast centrifuge system;
  • Assembly and installation of the pre-fermenters, being 200 m³ each;
  • Assembly and installation of the juice evaporation system with integrated system of Multivias for the steam and great diameter pipes – up to até 60”;
  • Assembly and installation of juice decanters – 02 unities cap. 600 m³ each;
  • Assembly and installation of the particle separator filters system;
  • Assembly and installation of the vacuum filtration system;
  • Interconnection of the cooling towers system;
  • Interconnection of the high pressure vapor system – 67,0 kgf/cm², connecting with the 02 energy turbines 30 MW;
  • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Manufacturing and assembly of the ethanol tanks cap 10.000 m³ e 20.000 m³ with integrated fire system;
  • Assembly and installation Cane feeding system (feeder table and conveyor belt)
  • Assembly and installation Alcohol distilling equipment – cap. De 1.000 m³ each;

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Costa Rica
Job details
  • Alcohol storage system:
    • 02 Tanks cap. 20.000 m³ each;
    • 02 Tanks cap. 10.000 m³ each.
  • Water storage system:
    • 01 Tank cap. 3.000 m³ de demineralized water;
    • 01 Tank cap. 2.000 m³ de cleared water;
    • 01 Tank cap. 1.000 m³ de raw water.

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Rio Claro
Job details
  • Installation and assembly of the Fermentation System, being 8 vats of 2.000 m³ each;
  • Assembly and installation of the yeast centrifuge system;
  • Assembly and installation of the pre-fermenters, being 3 unities 200 m³ each;
  • Assembly and installation of the juice evaporation system with integrated system of Multivias for the steam and great diameter pipes – up to até 60”;
  • Assembly and installation of juice decanters – 02 unities cap. 600 m³ each;
  • Assembly and installation of the particle separator filters system;
  • Assembly and installation of the vacuum filtration system;
  • Interconnection of the cooling towers system;
  • Interconnection of the high pressure vapor system – 67,0 kgf/cm², connecting with the 02 energy turbines 30 MW;
  • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Manufacturing and assembly of the ethanol tanks cap 10.000 m³ e 20.000 m³ with integrated fire system;
  • Assembly Cane feeding system (feeder table and conveyor belt);
  • Assembly and installation Alcohol distilling equipment – cap. De 1.000 m³ each;

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Alcídia
Job details
  • Installing and assembly of the energy cogeneration system:
    • Backpressure turbo generator – 25 MW;
    • Condensing turbo generator – 30 MW;
    • Pipe-Racks supply and assembly and power house structures;
    • Interconnection of the high pressure steam system 67 kgf/cm² between boiler and power house;
    • Interconnection of the cooling towers system;
    • Interconnection of the steam reducing system;
    • Supply and assembly of the power house floor

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Conquista do Pontal
Job details
  • Alcohol storage system:
    • 02 Tanks cap. 20.000 m³ each.
  • Bagasse conveyor belts;
  • Interconnection of the high pressure vapor system – 67,0 kgf/cm², connecting with the 02 energy turbines 30 MW;
  • Interconnection of the cooling towers system;
  • Interconnection of the vapor lowering system with conditioner valves of 67,0 kgf/cm² to 21 kgf/cm² and 1,5 kgf/cm²;
  • Installation and assembly of the sugarcane bagasse system.